New Ceiling tiles for Large Factory in Manchester
This week, Granmore have been installing ceiling tiles in a large factory in Manchester.
The customer needed a new ceiling fitting as the old one was very high up and filled with glass, which let an awful lot of heat out of the space and the workers were complaining of the cold.
We sent our suspended ceiling installers who fitted a full N D Fissured tile and white grid ceiling throughout the whole area a lot lower down to trap in the heat.
The customer and the workers are very pleased with the outcome and are ready to use the new space now.